The day-schedule planner is a court-by-time grid where you, as the organiser, drag, swap and fine-tune matches. Each row is a court and each column is a time slot. As you move things around, Slams checks for conflicts in real time and highlights them in red. This keeps you in control of the schedule without having to work in a spreadsheet.
Two places: per event and per part
The planner comes in two forms that work in the same way:
- Event-wide (Schedule tab): for an event with multiple parts you plan all parts together across several playing days. The courts come from your club's courts, and each part gets its own colour so you can tell them apart.
- Per part (Day-schedule tab): for a tournament part you plan just that part. The courts here are the court numbers you chose in the settings (for example Court 2 through 5), and the time axis runs from the start time using the configured match duration.
Before you can schedule anything, a schedule has to exist. So first generate the groups and knockout, see generating a schedule.